Here’s a detailed Audit Execution Document for SayPro Monthly February SCDR-2, specifically for the Health and Safety Audit conducted by the SayPro Development Strategic Partnerships Office under SayPro Development SCDR. The document includes potential risks, safety violations identified during the audit, and recommended corrective actions or improvements.
SayPro Audit Execution Document
Document Title: SayPro Monthly Health and Safety Audit Execution Report
Audit Reference: February SCDR-2
Department: SayPro Development – Strategic Partnerships Office
Date of Audit: February 2025
Auditor(s): [Insert auditor name(s)]
Location(s): [Insert audited site(s)]
Prepared By: [Insert preparer’s name]
Approved By: [Insert approver’s name and title]
Audit Objectives
- Ensure compliance with SayPro’s internal Health & Safety (H&S) policies.
- Identify potential health and safety risks.
- Verify that previous corrective actions have been implemented.
- Recommend improvements aligned with ISO 45001:2018 and local occupational health and safety legislation.
Scope of the Audit
- Administrative offices under SayPro Development
- Project field sites under active Strategic Partnership programs
- Storage and distribution facilities (if applicable)
Identified Risks and Safety Violations
Risk/Violation | Description | Severity | Location | Date Identified |
---|---|---|---|---|
Inadequate Fire Safety Equipment | Fire extinguishers not serviced; signage not visible | High | Field site #3 | 10 Feb 2025 |
Blocked Emergency Exits | Exit doors obstructed with boxes and equipment | High | Admin Office Block B | 12 Feb 2025 |
PPE Non-compliance | Workers not wearing required PPE (helmets, gloves) | Medium | Field site #1 | 14 Feb 2025 |
Slippery Floor Without Warning Signs | No caution signage near wet floors after cleaning | Medium | Reception Area | 11 Feb 2025 |
Expired First Aid Kit | Some items in first aid box expired (bandages, antiseptic) | Low | Field site #2 | 13 Feb 2025 |
Lack of H&S Training Records | Incomplete or missing H&S training logs for new staff | Medium | Admin HQ | 15 Feb 2025 |
Immediate Corrective Actions
- Fire Safety
- Schedule immediate servicing of all fire extinguishers.
- Ensure signage is visible and correctly placed by 28 Feb 2025.
- Emergency Exits
- Clear all emergency exits immediately.
- Conduct weekly walkthroughs to maintain clear egress paths.
- PPE Compliance
- Reinforce PPE policy via toolbox talks.
- Supervisor to monitor compliance daily.
- Wet Floor Safety
- Provide mobile caution signs to janitorial team.
- Train custodial staff to deploy signs during and post-cleaning.
- First Aid Supplies
- Replace expired items by 20 Feb 2025.
- Implement a monthly checklist for first aid kit inspections.
- Training Documentation
- HR to verify and upload all missing training records by 25 Feb 2025.
- Implement a digital tracking system for future compliance.
Recommendations for Improvement
- Quarterly Fire Drills: Institute regular fire evacuation drills and document participation.
- Digital H&S Monitoring Tool: Adopt software to track audit findings, actions, and training compliance.
- Incident Reporting System: Streamline reporting process via mobile app or internal platform.
- Behavior-Based Safety (BBS) Program: Encourage safe practices through positive reinforcement and peer recognition.
- Regular Supervisor Safety Walks: Weekly documented safety checks by team leads.
Conclusion
The audit revealed several compliance gaps that pose safety risks if not promptly addressed. However, these risks are manageable with the immediate corrective actions proposed. Leadership commitment and improved monitoring systems will significantly reduce recurrence and strengthen SayPro’s safety culture.
Audit Sign-Off
- Auditor Name/Signature: _______________________
- Date: _______________________
- Reviewed By (Manager/Supervisor): _______________________
- Date: _______________________
Would you like this formatted as a Word or PDF document, or adapted into a checklist format for field use?